Quotation Request Form (QRF) - broken down
Key inputs that must be supplied in a Quotation Request Form (QRF) for a Pre-Engineered Building (PEB) project are grouped below. If any of these items are missing the supplier cannot price or design the building accurately.
-
General project data
• Project / building name
• Exact site address (affects wind & seismic codes, freight, taxes)
• Intended use / occupancy category
• Required delivery / erection schedule -
Geometry
• Clear span width (outside-to-outside of main frames)
• Building length (number of bays × bay spacing)
• Eave height (bottom of knee connection to finished floor)
• Roof slope (e.g., 1:10 or 2:12)
• Required roof live load (kN/m² or psf)
• Collateral loads (false ceiling, sprinklers, HVAC, lighting, etc.)
• Floor live load (if mezzanine is requested) -
Cladding specification
• Roof sheeting: single-skin or insulated sandwich panel, thickness, color coating, finish
• Wall sheeting: same detail as roof, plus liner panel if required
• Skylight / daylight panels area (if any) -
Environmental / code parameters
• Basic wind speed (3-sec gust) or wind pressure
• Seismic zone / design acceleration
• Snow load (if applicable)
• Temperature range for insulation calculation
• Local building code and edition (IBC, Eurocode, IS 875, ASCE 7, etc.) -
Structural add-ons
• Overhead crane: capacity, hook height, class of usage, runway length
• Mezzanine: area, floor loading, column grid
• Canopies / lean-tos: width, projection, height
• Parapet height, fascias, gutters, downpipes -
Openings & accessories
• Ridge vent or turbo vent area
• Roll-up doors: clear opening width × height, quantity
• Personnel doors: size, location, fire rating
• Louvers / windows: size and quantity
• Insulation: roof and/or wall R-value or U-value target -
Architectural finishes & extras
• Color chart reference for roof & wall
• Special coatings (e.g., food-grade, coastal environment)
• Fire-proofing requirements
• Internal partitions (if supplied by PEB vendor) -
Site constraints
• Maximum truck length allowed to site
• Crane reach restrictions for unloading / erection
• Local welding restrictions or pre-approved vendors -
Commercial terms
• Scope split (supply-only vs. supply-and-erect)
• Applicable taxes, duties, freight responsibility
• Incoterms (EXW, FOB, CIF, DDP, etc.)
• Payment milestones
• Performance bond / insurance requirements
Supplying all of the above in the QRF ensures the PEB supplier returns an accurate quotation, preliminary general-arrangement drawing, and a detailed BOQ without back-and-forth clarifications.
No Comments